GENERAL

  • Scope and Field of Application
  • Plant block identification
  • Measurement Units
  • References
  • Abbreviations

ACTIVITIES TO BE PERFORMED

  • Piping layout
  • Isometrics
  • Erection Drawings
PIPING INSTALLATION
  • Pipe Racks
  • Pipe Ways
  • Columns
  • Vessels and Reactors
  • Storage Tanks - Atmospheric and/or Low Pressure
  • High Pressure Storage Vessels
  • Heat Exchangers
  • Pumps
  • Compressors
  • Steam Turbines
  • Heaters
  • Loading Arms
  • Air Coolers
PIPING COMPONENT INSTALLATION
  • Manually actuated operation/shut-off valves
  • Check Valves
  • Control Valves
  • Motorized Valves
  • Actuated Valves with/without Fire Proofing Protection
  • Actuated Valves with emergency air storage vessels
  • Safety Valves
  • Orifice flanges and Annubars
  • Steam Traps
  • Service Hoses
  • Sample connections
  • Instrument accessibility
  • Levels
  • Miscellaneous

Piping Layout
This activity consists to define the layout of the piping present on the Plant. Normally it is
developed using the following operating methods, either singly or combined:
  • Studies on paper;
  • 3D model.
Studies on paper are generally utilized for the revamping of existing Plants, where only the erection drawings are available, or for the interconnecting or Off-site areas. The performance of this activity involves the solution of problems that are jointed to constraints as safety, cost-effectiveness, functionality and accessibility and dealt (see Paragraph 3).
Normally, Plant process and utilities pipes are installed aboveground, gathering them, as far as possible, in orderly bundles on appropriate support structures, which are called Piperack's. Exceptions are the sewer system sea cooling water, potable water and fire-fighting pipes which are installed below the Plant grade level. For the design of these type of pipes see 3034.00.ED.PI.DCR.50001 ‘Technical Specification for sewer e underground piping network’. The aboveground piping layout shall have a simple and well-organized arrangement, the network configuration shall be in according to Mechanized P&I diagrams, moreover suitable access for operability and maintenance and economic supports shall be provided . The following activities are developed at the same time as the piping layout activities:
  • Nozzles orientation and foundations aboveground profile;
  • Single-line drawings of structures and auxiliary.